Friday, July 25, 2008

Details

Now it's time for the electric, plumbing, and assorted other details before the next inspection. This doesn't move at the same speed the framing did.

Hot and cold and drain for the washer.

The skylight for over the shower. The blue plastic cover will stay on until the installation.

A stack of doors.

The frame for the bath tub.

The window over the tub. We'll get old fashioned shutters for this one.

No comments: